Marked as one of the top exhibitors at the Drives & Controls event 2022, Apex Dynamics is a worldwide leader in the design and manufacture of servo and planetary gearboxes, boasting the fastest delivery in the industry.
Offering a unique package which no other servo gearbox supplier can match, Apex’s planetary gearboxes have a number of patented design features which offer unique advantages for higher performance. Apex offers a unique 5-year warranty across its complete range of servo gearboxes, rack and pinion products, and focus on quality, delivery and cost-effectiveness throughout all its services.
Genuinely Unique?
At the outset we should emphasise that no other servo gearbox supplier can match this offer – not fully and not even in part !
It Starts with Design
We have Patented Designs for high performance.
Why Does Patented Technology Matter in Planetary Gearboxes?
Our planetary gearboxes have a number of patented features which offer unique advantages for higher performance. For example, the single piece construction with bearing mounted sun gear is a huge advantage.
The main internal carrier is machined on a single piece of steel and all surfaces have the same datum, thereby guaranteeing full concentricity and alignment from input shaft to output shaft. This design also reduces indifferent thermal expansion when compared to the normal two-piece construction, as well as reduced heat build-up due to reduced input bearing speed.
In addition, there are multiple other patented design features around the input and output sealing designs, lubrication flow to the needle bearings all of which contribute to the low – friction performance for improved life.
Unique 5 Year Warranty
The excellence of design, highest quality of materials and manufacturing processes results in our gearboxes having outstanding performance and life in service and enables us to offer a 5-Year Warranty on our complete range of servo gearboxes and rack and pinion products.
Apex Dynamics Ltd commenced supplying customers in the UK and Ireland early in 2019 but its important to know that this 5- Year Warranty is operated by our manufacturing unit and has been in place with other parts of the Apex Dynamics international network for more than 15 years.
Unmatched 2-3 Week Lead Time
With 100,000 gearboxes manufactured for stock and ready for final configuration, Apex Dynamics is in a commanding position to deliver in two to three weeks on all of its standard range of planetary and spiral bevel gearboxes and rack and pinion solutions. Competitor delivery times are typically 10 to 20 weeks at present.
On-Time Delivery Or It’s FREE!
Guaranteed Delivery – Another Industry First for Apex Dynamics
The ongoing disruptions to manufacturing and engineering businesses arising from the CV19 pandemic issues and post – Brexit difficulties with engineering component supplies from EU manufacturers are putting huge strains on supply chains for processing and automation machinery manufacturing and repair.
At Apex Dynamics we are able to offer our customers complete isolation from any of these problems in the supply of servo gearboxes and other automation system components by offering Guaranteed Delivery.
- So what do we mean by “Guaranteed Delivery”?
- Quite simply we mean – On Time Delivery or its FREE
- Not Free Delivery charges – FREE PRODUCT if we are late on what we acknowledged as the delivery date !
Largest Range for a Key Servo Component
Within the whole spectrum of automation system components used in machine and other process control applications, some components are more crucial to machine performance than others, some are available from a wide range of sources and others have a much smaller pool of sources with much less ability for them to be substituted without significant design changes to the machine being necessary.
Apex Dynamics has a full range of planetary and other servo gearboxes with drop-in replacements for most competitor’s models and the widest range of gearbox ratios from any major supplier. This makes it easy for customers to substitute models they may be currently using without design changes.
APEX Is ATEX As Standard
ATEX rating has traditionally been a difficulty for many machine applications which have the requirements for operating in potentially hazardous environments, where explosive gases or dust could be present.
ATEX certification on machine components has historically come at a substantial additional cost and with extended lead times and to some customers it feels like manufacturers are treating this requirement as a license to print money.
With Apex Dynamics gearboxes this is not the case. The ATEX requirements were incorporated during the early design phase and with some of our patents have enabled Apex to achieve Category II 2 GD c T6 classification on our standard gearbox ranges, to the latest ATEX DIRECTIVE 2014/34/EU.
Heath House, Cheadle Rd, Uttoxeter ST14 7BY
Tel: 0121 227 5340 or 0800 1077599
Email: sales@apexdynauk.com Website: https://www.apexdynauk.com/